Page 33
Start-Up and Performance Checklist
Job Name
Job no.
Date
Job Location
City
State
Installer
City
State
Unit Model No.
Serial No.
Service Technician
Nameplate Voltage
Rated Load Ampacity
Compressor
Outdoor Fan
Maximum Fuse or Circuit Breaker
Electrical Connections Tight?
Indoor Filter clean?
Supply Voltage (Unit Off)
Indoor Blower RPM
S.P. Drop Over Indoor (Dry)
Outdoor Coil Entering Air Temp.
Discharge Pressure
Vapor Pressure
Refrigerant Charge Checked?
Refrigerant Lines:
Leak Checked?
Properly Insulated?
Outdoor Fan Checked?
Service Valves:
Fully Opened?
Caps Tight?
Thermostat
Voltage With Compressor Operating
Calibrated?
Properly Set?
Level?
Summary of Contents for ML16XP1 Series
Page 28: ...Page 28 Wiring and Sequence of Operation FIGURE 15 Typical Unit Wiring 018 thru 030 units ...
Page 29: ...Page 29 FIGURE 16 Typical Unit Wiring 036 thru 060 units ...
Page 30: ...Page 30 FIGURE 17 Typical Factory Wiring 018 thru 030 units ...
Page 31: ...Page 31 FIGURE 18 Typical Factory Wiring 036 thru 060 units ...