Page 6

LGH036-360 Agency

Typical Gas Heat Schematic

New Form No.

Supersedes

WIRING DIAGRAM

GAS HEAT, 130, 180 AND 240

07/18

HEATING

SECTION A

REV. 0

537705-03

537705-04

KEY

DESCRIPTION

A3

CONTROL, BURNER 1

A55

CONTROL, MAIN BOARD LENNOX

B6

MOTOR COMBUSTION AIR BLOWER

C3

CAPACITOR, COMB AIR BLOWER 1

E1

SPARK

FS1

SENSOR FLAME

GV1

VALVE GAS 1

HR6

HEATER, -50C LOW AMBIENT KIT

J15

JACK, BURNER 1

J19

JACK, COMBUSTION AIR BLOWER 1

J135

JACK, PRIMARY LIMIT

J228

JACK, VESTIBULE HEATER

J229

JACK, VESTIBULE HEATER CONTROL 1

J265C

JACK, CONTACTOR RELAY

J266A

JACK, HEATING CONTROL STG 1

J271A,B JACK, HEATING SENSORS STG 1
K13,-1

RELAY, COMBUSTION AIR BLOWER

K123, -1 RELAY, SINGLE THROW LIMIT
K125,-1 RELAY, HEAT SHUT OFF
P15

PLUG, BURNER 1

P19

PLUG, COMBUSTION AIR BLOWER 1

P135

PLUG, PRIMARY LIMIT

P228

PLUG, VESTIBULE HEATER

P229

PLUG, VESTIBULE HEATER CONTROL 1

P265

PLUG, CONTACTOR RELAY

P266

PLUG, HEATING CONTROL

P271

PLUG, HEATING SENSORS STG 1

S10

SWITCH, LIMIT PRIMARY GAS

S18

SWITCH, COMBUSTION AIR BLOWER PROOF

S47

SWITCH FLAME ROLLOUT BURNER

S59

TSTAT, OPEN -20F, CLOSE 10F

S60

TSTAT, OPEN 20F, CLOSE -10F

S61

TSTAT, OPEN 50F, CLOSE 20F

T3

TRANSFORMER COMB AIR BWR 1

S60

S61

S59 (1)

CAB

(24 VAC)

S10-C

S10-NC

S10-NO
S21-C

S21-NC

H1

S47
S47

S18

S18

GV1

A8,

K15

W2,

K16

1

2

3

4

5

6

7

8

9

10

2

3

1

K13

P265

J265D

9

COMM

P266

J266A

B

P271 J271

A55

FROM F10

F10 USED ON UNITS WITH SCCR OPTION

F10

FUSE, OUTDOOR FAN MOTOR

T3 NOT CONNECTED TO F10 ON 575V SCCR UNITS

Summary of Contents for LGH 036

Page 1: ...e replaced and pre filter must be removed upon construction completion The input rate and temperature rise must be set per the unit r ating plate The heat exchanger components duct system air filters...

Page 2: ...n LGH156 180 210 240 242 300 360 UNIT CLEARANCES C D B A Outdoor Air Hood Number of fans varies by model Figure 3 1 Unit Clearance A in mm B in mm C in mm D in mm Top Clearance Service Clearance 60 15...

Page 3: ...ocal codes require the installation of such a valve Install a ground joint union between the gas control mani fold and the main manual shut off valve When making piping connections a drip leg should b...

Page 4: ...NION BOTTOM ENTRY GAS PIPING COMPLETED 7 NIPPLE STREET ELBOW TO GAS SUPPLY TO GAS VALVE Grommets for both gas pipe openings are field provided 2 1 2 NIPPLE Figure 10 High Altitude Derate ULNOx Units U...

Page 5: ...o measure manifold pressure Start unit and allow 5 minutes for unit to reach steady state 2 After allowing unit to stabilize for 5 minutes record manifold pressure and compare to value given in table...

Page 6: ...AY COMBUSTION AIR BLOWER K123 1 RELAY SINGLE THROW LIMIT K125 1 RELAY HEAT SHUT OFF P15 PLUG BURNER 1 P19 PLUG COMBUSTION AIR BLOWER 1 P135 PLUG PRIMARY LIMIT P228 PLUG VESTIBULE HEATER P229 PLUG VEST...

Page 7: ...Page 7 LGH036 360 Agency Typical Unit Schematic...

Page 8: ...Condenser Fan Relays Capacitor CAB Relay CAB Disconnect Switch Opt Defrost Control KD only Fan Control Board KD only Proper Gas Flow Approximate 1 Operate unit at least 15 minutes before checking gas...