Page 12
PLACING UNIT ON SLAB
When installing unit at grade level, the top of the slab
should be high enough above grade so that water from
higher ground will not collect around the unit. The slab
should have a slope tolerance as described in figure 3,
Detail B.
ROOF MOUNTING
Install the unit a minimum of 6 inches (152 mm) above the
roof surface to avoid ice build-up around the unit. Locate
the unit above a load bearing wall or area of the roof that
can adequately support the unit. Consult local codes for
rooftop applications.
If unit coil cannot be mounted away from prevailing winter
winds, a wind barrier should be constructed. Size barrier at
least the same height and width as outdoor unit. Mount
barrier 24 inches (610 mm) from the sides of the unit in the
direction of prevailing winds.
NOTICE
Roof Damage!
This system contains both refrigerant and oil. Some
rubber roofing material may absorb oil and cause the
rubber to swell when it comes into contact with oil. The
rubber will then bubble and could cause leaks. Protect
the roof surface to avoid exposure to refrigerant and oil
during service and installation. Failure to follow this
notice could result in damage to roof surface.
Removing and Installing Louvers
WARNING
To prevent personal injury, or damage to panels, unit or structure, be sure to observe the following:
While installing or servicing this unit, carefully stow all removed panels out of the way, so that the panels will not cause injury to personnel,
nor cause damage to objects or structures nearby, nor will the panels be subjected to damage (e.g., being bent or scratched).
While handling or stowing the panels, consider any weather conditions, especially windy conditions, that may cause panels to be blown
around and battered.
WARNING
PANEL A
PANEL B
PANEL C
PANEL D
When removing the unit panels. Remove panel
A
first, then
B
,
C
and
finally
D
. When reinstalling panels, reverse that order starting with panel
D
,
C
,
B
and finally
A
.
REMOVAL
REPEAT STEPS 1, 2 AND
3 TO REMOVE PANELS
B
,
C
AND FINALLY
D
.
STEP 1
STARTING WITH PANEL
D
,
INSERT PANEL UNDER UNIT
TOP CAP LIP AND LIFT
SLIGHTLY TO CLEAR SIDE LIP
OF PANEL FROM BASE.
PANEL A
PANEL A
STEP 2
INSTALLATION
REPEAT STEPS 1 AND 2 TO
INSTALL PANELS
C
,
B
AND
FINALLY
A
.
TO REMOVE PANEL,
REMOVE MOUNTING
SCREWS SECURING
PANEL TO THE UNIT.
SLIGHTLY LIFT PANEL
A
IN
ORDER TO CLEAR SIDE
LIPS OF PANEL FROM
BASE OF UNIT.
STEP 3
TILT PANEL OUT SLIGHTLY
AND PULL DOWNWARD
TO REMOVE.
STEP 1
STEP 2
MOVE PANEL IN TOWARDS UNIT.
ALIGN LEFT/RIGHT SIDE LIPS OF
PANEL WITH GROOVE INSERTS
ALONG LEFT/RIGHT SIDE OF UNIT.
PANEL D
TOP CAP
BASE
SIDE
GROOVE
STEP 3
SECURE PANEL, WITH
MOUNTING SCREWS.
Figure 4. Louvers