Installation manual - English
Roof
Before installing the roof, make sure that the house is completely level. Use the water-level to check
all walls.
ATTENTION
: When placing the roof, use a stable ladder. Do not step on the roof as the structure is
suitable to sustain only an even load (snow, wind, etc.), and not a point load!
Start placing the roof boards with the longest board from the bottom. Put the groove side downwards
that the bottom side of the board will meet the ends of the rafters. It is recommended to place the roof
boards in turns on the all sides of the roof. 3-5 roof boards in one turn. Fixate the roof boards on the
rafters with 2,5x50 mm nails.
After you have installed the roof boards, cover it with roof covering material (not included in house kit).
It is necessary to avoid the bulging of the roof boards due to wetness.
Summary of Contents for 103728
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Page 11: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Page 12: ......
Page 13: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Page 14: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Page 15: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Page 16: ...AS Palmako Näituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com ...
Page 17: ...Pst2 Pst1 Sla1 ...
Page 18: ...Ø5 1 2 ...
Page 19: ...A A A A 40 TU44 110P 013 014 Rel 1 4 5x70 x3 ...
Page 20: ... 4 5x70 4 5x70 014 013 5x90 x3 5x90 x3 ...
Page 21: ...UP3 UP2 UP1 UP2 UP3 UP1 Det1 RoR2 RoR1 RoR1 RoR2 RoR3 RoR3 RoR3 ...
Page 22: ... 5x90 Ø3 1 2 5x90 2 5x50 3 5x40 3 5x40 3 5x40 UPx RoRx ...
Page 23: ... 5x90 Ø3 1 2 5x90 Det1 ...