Installation manual
– English
Preparation of components:
Sort the components based on the
wall
plans
(see
Technical
specifications) and place them at
the four sides of the house in the
installation sequence.
ATTENTION:
Never place the
components directly on grass or a
muddy surface because it will be
very difficult or even impossible to
clean them up later!
Foundation
A good foundation is the most important aspect guaranteeing the duration and safety of your house.
Only a completely level, rectangular and bearing foundation will ensure problem-free installation of the
house, its stability and especially the matching of the doors. With a good foundation, your house will
stand for many years more.
Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At
the same time make sure that there are sufficient air apertures under the house floor for ventilation.
We recommend the following foundation options:
•
Strip or spot foundation
•
Foundation from concrete or pavement slabs
•
Cast concrete bed
Prepare the foundation so that the foundation joists are propped up on every side with intervals not
exceeding 50-60 cm.
Consult an expert in this field or have the foundation prepared by specialists.
3 Garden house assembly
ATTENTION
:
➢
The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm
long).
These details listed above ARE NOT mentioned in the specification list.
➢
The drawings have the details marked with three-digit position numbers. The exact positions of
those details that have the third digit “x” can be found in the specification list.
Summary of Contents for 102274
Page 5: ......
Page 6: ...BOX ...
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ... 1 5 9 ...
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ...4700 4500 3800 3600 4700 4500 3800 3600 2052 2777 1 5 9 ...
Page 15: ......