STEP 44
Attach M4 Wall Rails, noting pre-
drilled holes in M4 Rail at 1-1/2”
from edge towards C2 Post at
backside of Set. Flush M4 to
outside of M1 Wall Rails and fasten
to C2 Post using 2” Wood Screws.
Now level across to the other C2
Post and attach there with 2” Wood
Screws.
STEP 45
Attach six M9 Wall Boards to inside of M4 Wall
Rails approximately 2-3/4” apart using 1-1/4”
Wood Screws.
M4
M4
H6
H6
G5
G5
C2
C2
C2
C2
M9
M9
M9
M9
M9
M9
11/16 x 3-3/8 x 45-3/4 [ 1.74 x 8.57 x 116.21 ]
M4 Wall Rail * 4 Holes * 2 Req
11/16 x 3-3/8 x 23 [ 1.74 x 8.57 x 58.42 ]
M9 Wall Board * 4 Holes * 23 Req
#8 X 1-1/4
WOOD
SCREW
"
#8 X 2
WOOD
SCREW
"
© Copyright Playground Inc
Next Generation 5007 061206
Page 29
M4
M4
Flush with
M1 Wall Rail
Flush with
C2 Post