STEP 39
Attach six M6 Wall Boards and one N2 on back
left placing three M6s, then one N2 and the
remaining three M6s then Space evenly and
Fasten using 1-1/4” Wood Screws in Bottom
Rail and 1-1/2” Wood Screws in Top Rail. Now
repeat on front left and front right of Tower
Assembly.
STEP 40
Install 5/16” Spike T-Nuts inside C3 Posts and attach H9 using 5/16 x 3-3/4” Hex Bolts, Internal Tooth Lock
Washers and Flat Washers. Measure up 3-1/2” from top of H7 Floor Rail and mark C3 Post. Now attach H9
with bottom of H9 Wall Rail at marks on Post, pilot drill using 3/16" bit and attach using 2-1/2” Lag Screws,
Internal Tooth Lock Washers and Flat Washers. Make sure that H9 is flush with outside of C3. Now attach six
M9 Wall Boards to H9 Wall Rails on right side of Tower spacing approximately 2-3/4” apart using 1-1/2” Wood
Screws.
M6
M6
N2
G2
C3
C3
M9
M9
M9
M9
M9
M9
1 x 3-1/2 x 45 [ 2.54 x 8.89 x 114.30 ]
H9 Wall Rail * 2 Holes * 2 Req
11/16 x 3-3/8 x 29 [ 1.74 x 8.57 x 73.66 ]
M6 Club House Wall Board * 4 Holes * 28 Req
11/16 x 3-3/8 x 23 [ 1.74 x 8.57 x 58.42 ]
M9 Wall Board * 4 Holes * 23 Req
11/16 x 2-1/2 x 29 [ 1.74 x 6.35 x 73.66 ]
N2 Club House Wall Board * 2 Holes * 3 Req
5/16 X 3-3/4"
HEX
HEAD
BOLT
5/16"
SPIKE TEE
NUT
5/16"
LOCK
WASHER
INTERNAL
TOOTH
5/16" FLAT
WASHER
#8 X 1-1/2
WOOD
SCREW
"
#8 X 1-1/4
WOOD
SCREW
"
5/16 X 2-1/2"
LAG
SCREW
© Copyright Playground Inc
Next Generation 5007 061206
Page 27
3 ½"
H9
H7
H9