Page 46
Step 77
Step 76
Pound five
Y35-24.5G Metal Rungs
into
E1 End Ladder Rail
. Now place opposite E1 Ladder Rail on Rungs and use
pounding block to drive until 22 ½” apart. (Per diagram)
Note: Use rubber mallet or scrap piece of wood as pounding block to avoid damage to End Ladder Rails
Attach
K8 Monkey Bar Angle Braces
to
E1 Ladder Rails with 5/16” X 3 ¼” Hex
Bolts, Lock Washers, Flat Washers and
Spike T-Nuts. Attach
H2 Monkey Bar
Ground Board
to E1 End Ladder Rails
flush to bottom with 5/16” X 2” Lag
Screws, Lock Washers and Flat
Washers through H2 Ground Board into
K8 Angle Braces with 5/16” x 1 1/2” Lag
Screws, Lock Washers and Flat
Washers.
Attach
P35 End Ladder Back
to E1 End
Ladder Rail with 2” Wood Screws
K8
H2
K8
E1
E1 - End Ladder Rail - 8 Holes - 2 Required
1.375 x 3.375 x 90.5 [3.49 x 8.57 x 229.87]
H2 - Monkey Bar Ground Board - 6 Holes - 1 Required
.9375 x 5.375 x 84 [2.38 x 13.65 x 213.36]
K8 - Monkey Bar Angle Brace- 1 Holes - 2 Required
.9375 x 3.375 x 57.5 [2.38 x 8.57 x 146.05]
P35 - End Ladder Back - 4 Holes - 1 Required
.625 x 3.375 x 25 [1.58 x 8.57 x 63.50]
Y35-24.5G
22 1/2”
E1
Y15
5/16 X 1-1/2"
LAG
SCREW
5/16 X 3 1/4"
HEX
HEAD
BOLT
5/16" FLAT
WASHER
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16"
SPIKE TEE
NUT
P35
© Copyright Leisure Time Products Inc.
Sky Fort 09-0112
Y35-24.5G
#8 X 2"
WOOD
SCREW
E1
E1