Fig. A
Führungsrolle deaktiv
19
6
8
Fig. B
24
25
23
Fig. C
12
18
Fig. D
9
Fig. E
7
WELDING
LEISTER Uniplan Wedge
Weld preparation
• Spread the weld material on a clean and level surface.
• The material to be welded must be dry and clean between the overlaps.
• The overlap width should be set as follows:
– Heating wedge 20 mm = overlap width 23 mm
– Heating wedge 30 mm = overlap width 31 mm
• The material must be stretched out tightly and fixed
.
Preparing for use
• Hook
extra weight (3)
onto
base plate (4).
• Swing
hot wedge (6)
upwards using
swivel lever (19)
and engage, (Fig. A).
• Set
guide roller (25)
to position "Inaktiv" (inactive) by means of
guide roller
knob (24)
and
guide roller lever (23)
, (Fig. B).
• Operate
lifting device (12)
by means of
lifting device lever (18)
so that
drive/pressure roller (8)
and
drive roller (10)
are at no-load, (Fig. C).
• Raise
pinch roller (9)
, (Fig. D).
•
Drive/pressure roller (8)
should be positioned parallel to the edge of
guide
roller (25).
See Page 5 for
drive/pressure roller (8)
track correction.
• Connect tool to mains. Mains voltage must correspond with tool voltage.
• Switch tool on using
main switch (16).
• The upper and lower surfaces of the
hot wedge (6)
must be cleaned after each weld run, using a fine
brass wire brush (Fig. E)