Leister FUSION 2 Operating Instructions Manual Download Page 6

Starting the welding process

•  Fit the required 

welding shoe (5)

 according to the paragraph „Change of welding shoe” (see page 15).

•  Welding can begin once the operating temperature has been attained. Operate the 

drive on/off switch (4)

 for

this purpose. Operate the tool only when feeding welding rod.

•  Feed welding rod into the 

welding rod opening (6)

 (see chapter welding rod) and allow a small amount plasti-

zised material to escape.

CAUTION! Never feed welding rod into both welding rod openings at the same time!

 (see page 

13 «Starting protection»).

The welding rod fed must therefore be clean and dry.

•  The extrusion rate can be changed using the 

extrusion rate regulation potentiometer (7)

 dependent on the

seam geometry and the choice of material.

•  Interrupt material extrusion using the 

drive on/off switch (4)

.

•  Direct the 

pre-heating nozzle (21)

 to the welding zone.

•  Pre-warm the welding zone with back and forth movements.
•  Position the tool on the prepared welding zone and operate

the 

drive on/off switch (4)

.

•  Carry out test welding and analyse.
•  Adjust the hot air temperature using the 

air temperature potentiometer (2)

 and the extrusion rate with the

extrusion rate regulation potentiometer (7)

 as required.

•  In case of a prolonged welding process, the 

drive on/off switch (4)

 can be held in the active state with the

locking device (3).

•  The welding rod is pulled in through the 

welding rod opening (6)

 automatically after starting. The welding rod

pull - in must not be impeded.

•  Release the 

locking device (3)

 by briefly pressing the 

drive on/off 

switch (4)

 and then letting go. Remove welding material from the

welding shoe in order to avoid damage on the welding shoe when
starting the next time.

•  The tool must only be laid down on the

 tool rest (8)

.

Use a fireproof base.

 The hot air jet must not be directed towards 

persons and objects.

• The 

air temperature potentiometer (2)

 to „0“. Let the tool cool down.

• Switch off at the 

hot air blower switch (1).

Switching off

Checking the temperature of the extruded material and the pre-heating temperature

•   The temperatures of the extruded material and the hot air jet are to be checked at regular intervals when car-

rying out welding work over an extended period:
 Fast display electronic temperature measuring devices with the appropriate temperature probes have to
be used. The highest temperature in the hot air jet between the nozzle outlet plane and a depth of 5 mm
is to be determined. The measurement probe must be inserted in the welding shoe in the middle of the
extruded material to measure its temperature.

8

21

Summary of Contents for FUSION 2

Page 1: ...FUSION 2 3C 3 Fusion 2 Fusion 3C Fusion 3...

Page 2: ...hot Allow the device to cool Do not direct stream of hot air or emerging material towards people or animals Warning The tool must be operated under supervision Heat can ignite flammable materials whi...

Page 3: ...mm FUSION 3 3 4 mm FUSION 3 4 5 mm Welding rod mm in accordance with DVS 2211 4 0 3 3 4 0 3 4 5 0 3 3 4 0 3 4 5 0 3 3 Welding output kg h Average values at 50 Hz PE 2 0 2 5 PP 1 8 2 3 PE 2 0 2 5 PP 1...

Page 4: ...off switch 5 Welding shoe 6 Welding rod opening 7 Extrusion rate regulation potentiometer 8 Tool rest 9 Handle 10 Tool handle 11 Drive unit 12 Hot air blower 13 Power supply cord 14 Air slide 15 Air i...

Page 5: ...2 up to 19 2 5 20 50 4 0 Starting protection The tool is equipped with current overload protection The drive switches off automatically if current consumption is too high The drive can for example not...

Page 6: ...entiometer 7 as required In case of a prolonged welding process the drive on off switch 4 can be held in the active state with the locking device 3 The welding rod is pulled in through the welding rod...

Page 7: ...extruder nozzle 19 of welding residue and make sure that it is screwed in tightly Remove welding shoe 5 from the welding shoe holder 17 by unfastening the fastening screws 20 Assembly Fasten a weldin...

Page 8: ...urs brushes Hot air blowers ca 1000 hours brushes Repairs should only be carried out by authorized Leister Service Centres They guarantee a specialised and reliable Repair Service within 24 hours usin...

Page 9: ...Your authorised Service Centre is Copyright by Leister Allied Power Tools 12 76 Rushdale St Knoxfield VIC 3180 Australia T 61 3 9764 2911 E sales alliedpowertools com au W www alliedpowertools com au...

Reviews: