13
1
2
3
4
5
6
1
Air outlet
2
Air intake
3
Motor
4
Connection box
5
Connection box lid
6
Installation stand
Device description
Installation
• The device may only be installed by trained personnel.
• Installation size (view page 3 / 4.)
• Blower has to be mounted on
installation stand
(6)
using
four screws Ø M6.
• Protect blower from mechanical vibrations and shocks.
• Blower may be installed horizontally or vertically.
Operation
• Blower is designed for air inlet temperatures up to 200 °C.
• The blower must be connected by an electric engineer.
Pay attention to the direction of rotation!
• A suitable device for complete disconnection from the mains must
be provided in the mains connection!
• The appropriate connections should be made in the
connection
box (4)
depending on the voltage.
• For use in a dusty environment, a Leister stainless steel fi lter
should be fi tted onto the blower
air intake (2).
Circuit diagram
in connection box lid (5)
220 – 254 V 380 – 440 V 220 – 254 V
U1
W2
V1
U2
W1
V2
L3
L2
L1
V2
W2
U2
W1
U1
V1
L3
L2
L1
U1
W2
V1
U2
W1
V2
N
L1
Summary of Contents for ASO
Page 3: ...3 SILENCE Size mm...
Page 4: ...4 ASO Size mm...
Page 55: ...55 Leister SILENCE ASO Leister Leister SILENCE 100 C 200 C I EL 230 400...
Page 59: ...59 Leister Technologies AG 3D www leister com 3D LHS Leister Leister...
Page 80: ...80 Leister SILENCE ASO Leister Leister SILENCE 100 C 200 C I RU 230 400...
Page 84: ...84 Leister Technologies AG 3D 3D LHS www leister com Leister Leister...
Page 85: ...85 SILENCE ASO SILENCE 100 C 200 C J 230 400...
Page 89: ...89 Leister Technologies AG 3D www leister com LHS 3D...
Page 90: ...90 HLVWHU 6 1 62 6 1 CN...
Page 92: ...92 6 1 9a 9a P O PLQ 3D PEDU 3D G 1 3 PP PP U3 62 9a 9a P O PLQ 3D PEDU 3D G 1 3 PP PP U3...
Page 93: ...93 0 9 9 9 8 9 8 9 9 8 8 9 8 9 8 9 1...
Page 94: ...94 6 ZZZ OHLVWHU FRP...
Page 95: ......