GS14/GS16, Operation
31
Equipment setup
step-by-step
Step
Description
1.
Set up the tripod.
2.
Mount and level the tribrach on the tripod.
3.
Ensure that the tribrach is over the marker.
4.
Place and lock the carrier in the tribrach.
GS with external RTK device
GS14/GS16
5.
Screw the GS onto the carrier.
Insert the data storage device and
the batteries into the GS14/GS16.
6.
Check that the tribrach is still level.
Press the ON/OFF button on the
instrument for at least 2 s to switch
on the instrument.
7.
Hang the external battery onto a
tripod leg.
Screw the GS14/GS16 onto the
carrier.
8.
Hang the tripod bracket onto a tripod
leg and attach the radio housing onto
the tripod bracket.
Check that the tribrach is still level.
9.
Connect the GEV205 cable to the
GS08plus or the GEV264 cable to the
GS14/GS16, to the external battery
and to the radio housing.
Insert the data storage device and
the battery into the field controller.
10.
Insert the data storage device and the
battery into the field controller.
Connect the field controller to the
instrument if necessary.
11.
Connect the field controller to the
instrument if necessary.
To hang the field controller on the
tripod leg, use the hook on the hand
strap or use the utility hook. Refer to
the User Manual of the field
controller.
12.
To hang the field controller on the
tripod leg, use the hook on the hand
strap or use the utility hook. Refer to
the User Manual of the field
controller.
Insert the height hook into the
carrier.
13.
Insert the height hook into the
carrier.
Measure the antenna height using
the height hook.
14.
Measure the antenna height using the
height hook.
Press the ON/OFF button on the
instrument for at least 2 s to switch
on the instrument.
15.
Press the ON/OFF button on the
instrument for at least 2 s to switch
on the instrument.
-