40
Version 6.9, Revision H
Software
6
Dehydration date
Dehydration start time
Dehydration duration
Fig. 32
Displays start date and time, and duration of the automatic dehydration
cycle. Clicking on one of the indications opens the
Dehydration time
dialog
box
.
•
Click on individual parameters (day, month, year, hour or minutes) to
change the corresponding settings.
•
The desired duration of the dehydration procedure can be selected in the
duration field. Values from 1 - 48 hours are permitted.
• The entry must be confirmed by pressing the
Ok
button.
Note
•
To speed up the dehydration procedure, the dehydration cryochamber temperature can be lowered.
This can be done via the
Dehydration T-reduction
display.
•
The duration of the dehydration depends on the number of sections, the section thickness and the
type of tissue. To use this function efficiently, it is advisable to remove the section waste from the
cryochamber before the start of the dehydration.
Dehydration T-reduction
Displays temperature reduction for dehydration. Click on this display to change the currently selected
value. Values from 0 - 20 K can be selected.
Displays section thickness. Click on this display to change the currently selected value. Values from
0 - 200 μm can be selected.
Retraction value
Displays the currently selected retraction value. Click on this display to change the currently selected
value. Values from 50 - 250 μm are permitted.
Cutting speed
Displays cutting and return speed. Click on one of the displays to change the currently selected value.
Values 0 - 80 mm/s are permitted.
Right block edge
Displays left and right block edge. Click on the individual display to change the currently selected value.
Values 0 - 500 mm/s are permitted, see