Maintenance and cleaning
42 / 74
1.0
Vento
®
II
5 Maintenance and cleaning
Warning!
Risk of injury.
Disconnect the power supply before starting maintenance, repair and cleaning work.
Warning!
Risk of injury!
Wear appropriate working and protective clothing during all work. Comply with the regulations
of the pesticide or fertiliser manufacturer.
Warning!
Risk of injury.
Always comply with the regulations for the specific pesticide or fertiliser. Refer to the product
descriptions for the pesticide or fertiliser for more details.
Caution!
Risk of pollution due to incorrect handling of pesticides and fertilisers.
Comply with regulations and laws of the country in question.
Make sure that no pesticide or fertiliser is spilled.
Comply with the instructions from the pesticide or fertiliser manufacturer regarding handling,
storage and disposal of pesticides and fertilisers.
5.1 Maintenance schedule
Maintenance activity
Interval
Remark
Calibration test
At the beginning of a season or following a
product or product batch change
Check the cellular rotor shafts for contami-
nation and wear
Clean or replace the cellular rotors
After 20 operating hours and at the end of
the season
Check the brushes for contamination or
wear
Clean or replace them if necessary.
After each product change
Clean the hopper and agitator
After each season or product change
see
Chapter 5.2, "Spreading material hopper"
Check the seal between the hopper and
spreader
The seal must be in contact all the way
around.
When the hopper is removed/renewed
and at the end of the season
see
Chapter 5.2, "Spreading material hopper"
Check drive belt for wear
After 100 operating hours or every month
and at the end of the season
see "Install/Remove drive unit"
Check all felt seals for wear
After 100 operating hours or every month
and at the end of the season
Summary of Contents for Vento II
Page 73: ...Vento II 1 0 73 74 ...