1 . M a ke sure that the power has been turned OFF at the circuit bre a ke r.
2 . Connect wires to the UW flying leads as shown in the wiring diagram below
that is appro p r i a te to the UW model and ele c t r i cal supply.
3 . A t tach the UW to the wall box by inserting
s c rews into the two wide holes on the to p
and bottom of the attached metal bra c ke t .
M a tch them up with the holes in the wall
b ox and tighte n .
4 . Turn the circuit bre a ker ON. Wait one
m i n u te, then push the ON/OFF button fo r
each load and the lights will turn ON.
5. Te st and adjust the sensor if nece ss a r y.
6. A t tach the cover plate .
INSTALLATION
UW-200 Bi-Level Wiring
UW-200 Dual Circuit Wiring
WARNING
TURN THE POWER OFF AT THE CIRCUIT BREAKER
BEFORE INSTALLING THE SENSOR OR WORKING ON THE LOAD.
#12 – #14 AWG
Cu Wire Only
Visit our website for FAQs: www.wattstopper.com
UW-100 and UW-100-347 Wiring