2. Transportation and placement
2.3
Unpacking
To remove the packaging material, two people are required and they must comply with the following procedure:
- bring the item to the installation site using a forklift and/or a truck pallet with suitable characteristics (fig. 1);
- remove the plastic film and cardboards;
- bring down the wooden chute attached to the pallet and loose the screws of the brackets that fix the equipment on the
pallet (fig. 2);
- gently slide by hand the equipment along the chute using the wheels (fig.3);
- loose the four screws and remove the bracket on the right side of the equipment that fixed it to the pallet (fig.4).
(fig. 1)
Summary of Contents for 311111
Page 7: ...Keor MOD Top Entry FR 7 fig 3 fig 4 fig 2 B A C A B C ...
Page 14: ...14 4 Caractéristiques mécaniques ...
Page 19: ...Keor MOD Top Entry EN 19 fig 3 fig 4 fig 2 B A C A B C ...
Page 26: ...26 4 Mechanical data ...
Page 31: ...Keor MOD Top Entry IT 31 fig 3 fig 4 fig 2 B A C A B C ...
Page 38: ...38 4 Dati meccanici ...
Page 43: ...Keor MOD Top Entry DE 43 fig 3 fig 4 fig 2 B A C A B C ...
Page 50: ...50 4 Mechanische Daten ...
Page 55: ...Keor MOD Top Entry ES 55 fig 3 fig 4 fig 2 B A C A B C ...
Page 62: ...62 4 Datos mecánicos ...
Page 63: ...Keor MOD Top Entry 63 ...