
Daker DK 4.5, 6, 10 kVA
fr
7
4 Panneau arrière
13. Port de communication RS232
14. Coupure d’urgence alimentation (EPO)
15. Logement pour cartes
de communication en option
16. Connecteur expansion autonomie
17. Connexions d’entrée
18. Connexions de sortie
19. Interrupteurs de protection d’entrée
20. Ventilateurs de refroidissement
3 100 56
3 100 57
3 100 53
3 100 54
3 100 58
3 100 59
OUTPUT
INPUT
G2
N22
L21
G1
N1
L12
CB1
Utility Input
Breaker
RS232
EPO
Ext. Battery
OFF
S1
ON
G
-
+
P
arallel
W
or
k Comm.
Bus Not Intended to TNV Communication Networ
k
13
19
20
16
17-18
15
RS232
P
arallel
W
or
k Comm.
Bus Not Intended to TNV Communication Networ
k
EPO
Slot
OUTPUT
G2
N22
L21
INPUT
G1
N1
L12
L21-N22:
UPS OUTPUT
G2:
OUTPUT EAR
TH
GR
OUND
L12-N1:
UTILITY INPUT
G1:
INPUT EAR
TH
GR
OUND
Utility Input
Break
er
PA
T.
NO
.:
US 6906501,
TW 202668
13
20
15
19
17-18
CH B
SLOT
EPO
ON OFF
S1
Ext.
Batter
y
G
-
+
UTILITY
INPUT
BREAKER
BYPASS
INPUT
BREAKER
TB1
TB2
RS232
Not Intended to TNV Communication Networ
k
13
20
15
16
19
17-18
14
14
14
Summary of Contents for 3 100 53
Page 1: ... Part LE05380AC 07 13 01 GF Daker DK 4 5 6 10 kVA Manuel d installation Installation manual ...
Page 10: ...10 5 Installation Configuration tower A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 11: ...11 FR Daker DK 4 5 6 10 kVA Ups armoire batterie A4 Step 1 Step 2 ...
Page 12: ...12 5 Installation Configuration rack 19 B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 ...
Page 13: ...Daker DK 4 5 6 10 kVA 13 FR Step 5 Step 6 ...
Page 32: ...32 5 Installation Tower configuration setup A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 33: ...Daker DK 4 5 6 10 kVA 33 EN UPS battery cabinet A4 Step 1 Step 2 ...
Page 34: ...34 5 Installation B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 Configuration rack 19 ...
Page 35: ...Daker DK 4 5 6 10 kVA 35 EN Step 5 Step 6 ...
Page 54: ...54 5 Installazione Configurazione Tower A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 55: ...Daker DK 4 5 6 10 kVA 55 IT UPS armadio batteria A4 Step 1 Step 2 ...
Page 56: ...56 5 Installazione Configurazione rack 19 B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 ...
Page 57: ...Daker DK 4 5 6 10 kVA 57 IT Step 5 Step 6 ...
Page 76: ...76 5 Installation Tower konfiguration A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 77: ...Daker DK 4 5 6 10 kVA 77 DE USV batteriefach A4 Step 1 Step 2 ...
Page 78: ...78 5 Installation Konfiguration rack 19 B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 ...
Page 79: ...Daker DK 4 5 6 10 kVA 79 DE Step 5 Step 6 ...
Page 98: ...98 5 Instalación Configuración tower A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 99: ...Daker DK 4 5 6 10 kVA 99 ES SAI armario batería A4 Step 1 Step 2 ...
Page 100: ...100 5 Instalación Configuración rack 19 B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 ...
Page 101: ...Daker DK 4 5 6 10 kVA 101 ES Step 5 Step 6 ...
Page 113: ...Note 113 Daker DK 4 5 6 10 kVA ...
Page 114: ...114 Note ...
Page 115: ......