
52
®
interface settings
4 Pannello posteriore
l11-n1: terminali non utilizzati in questa versione
l12-n1: terminali per il collegamento alla rete di ingresso UPS(3 100 58)
r-s-T-n1 : terminali per il collegamento alla rete di ingresso UPS (3 100 59)
g1:
terminale per collegamento cavo di terra ingresso UPS
l21-n22: terminali per il collegamento di uscita UPS
g2:
terminale per collegamento cavo di terra uscita UPS
OUTPUT
G2 N22 L21
INPUT
G1
N1
L12
L21-N22: UPS OUTPUT
G2: OUTPUT EARTH
GROUND
L12-N1: UTILITY INPUT
G1: INPUT EARTH
GROUND
3 100 53/54/55/56/57
TB1
OUTPUT
TB2
INPUT
G1
G2
N1
N22
L12
L21
L11
UTILITY
BYPASS
DIM ONLY
TB1
TB2
3 100 58
TB1
OUTPUT
TB2
INPUT
N1
G2
T
N22
S
L21
R
TB1
TB2
3 100 59
G1
Summary of Contents for 3 100 53
Page 1: ... Part LE05380AC 07 13 01 GF Daker DK 4 5 6 10 kVA Manuel d installation Installation manual ...
Page 10: ...10 5 Installation Configuration tower A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 11: ...11 FR Daker DK 4 5 6 10 kVA Ups armoire batterie A4 Step 1 Step 2 ...
Page 12: ...12 5 Installation Configuration rack 19 B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 ...
Page 13: ...Daker DK 4 5 6 10 kVA 13 FR Step 5 Step 6 ...
Page 32: ...32 5 Installation Tower configuration setup A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 33: ...Daker DK 4 5 6 10 kVA 33 EN UPS battery cabinet A4 Step 1 Step 2 ...
Page 34: ...34 5 Installation B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 Configuration rack 19 ...
Page 35: ...Daker DK 4 5 6 10 kVA 35 EN Step 5 Step 6 ...
Page 54: ...54 5 Installazione Configurazione Tower A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 55: ...Daker DK 4 5 6 10 kVA 55 IT UPS armadio batteria A4 Step 1 Step 2 ...
Page 56: ...56 5 Installazione Configurazione rack 19 B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 ...
Page 57: ...Daker DK 4 5 6 10 kVA 57 IT Step 5 Step 6 ...
Page 76: ...76 5 Installation Tower konfiguration A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 77: ...Daker DK 4 5 6 10 kVA 77 DE USV batteriefach A4 Step 1 Step 2 ...
Page 78: ...78 5 Installation Konfiguration rack 19 B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 ...
Page 79: ...Daker DK 4 5 6 10 kVA 79 DE Step 5 Step 6 ...
Page 98: ...98 5 Instalación Configuración tower A1 A1 Optional A1 A1 Step 1 Step 2 ...
Page 99: ...Daker DK 4 5 6 10 kVA 99 ES SAI armario batería A4 Step 1 Step 2 ...
Page 100: ...100 5 Instalación Configuración rack 19 B2 B1 S3 90 Step 1 Step 2 Step 3 Step 4 ...
Page 101: ...Daker DK 4 5 6 10 kVA 101 ES Step 5 Step 6 ...
Page 113: ...Note 113 Daker DK 4 5 6 10 kVA ...
Page 114: ...114 Note ...
Page 115: ......