7
Concrete Anchoring (Materials not included
)
。
If the swing set is set up on grounds with sandy soil (soft( condition) it must be anchored
with concrete footing (concrete not included
)
。
Be sure that the swing set is assembled and placed on level ground
。
Dig holes around swing leg tube) as shown in drawing in the next page. As you dig deeper)
enlarge the diameter of the hole to fix the cement
。
Place . inches of brick or gravel underneath the leg) as shown in drawing in the next page
。
Use about 24 lbs. of concrete per leg
。
Cover the concrete with dirt and protective surface material
。
Allow 6,7 days for the concrete to dry properly