Mögliche Toraufhängungen
Operation and Assembly
3
Use a finger to hold the tube.
The floor bolt can be moved
up or down using the tube.
IWhen the tube is inserted
(in the top and bottom stop),
the movement is locked.
Operation is therefore
possible only when the
opposite wing is open.
If there is a lockable floor
bolt, install the profile
half cylinder beforehand in
accordance with the
instructions.
Insert the operating tube into
the hole in the upper part of
the floor bolt.
Insert and assemble the
expanding rivet in the operating
tube using long-nose pliers.
Assembled floor bolt and
secured gate wing.
Insert the floor bolt into the
frame profile that is open
at the bottom.
Assembly:
Before Installing the Gate Wing.
Operation
1.
2.
3.
4.
Integrated Floor Bolts
4.
Expanding rivet
Floor stop
2.
3.
Gate Wing
1.
Floor bolt
lockable
1b
1a
Floor bolt
LEGI-Revolving Wing Gate
VARIO-S
Assembly Instructions
patented
www.legi.de
We reserve the right to make structural modifications.