ULTRA
™
furniture
design
owners manual 99301592
16
POWER DOWN OPERATION
To lower the base to the
fl at
position during an electrical power outage, complete the following procedure:
STEP 1
Verify power is unplugged from electrical power source.
STEP 2
Locate (1) power brick (
FIGURE 13
) and (2) 9 volt batteries (not
included).
STEP 3
Install (2) 9 volt batteries in power brick (
FIGURE 14
).
FIGURE 13
POWER
BRICK
FIGURE 14
INSTALL (2) 9 VOLT BATTERIES
*BATTERIES NOT INCLUDED
UNDERSIDE OF
POWER BRICK
BATTERY
COMPARTMENT DOOR
(push down and slide off
to remove)