Securing Filter Box
Next install the 6lter rail to the same side being
used for inlet air.
Installing Filter Rail
Install the block oR jacket to the opposite side
using the supplied self drilling screws. NOTE:
e
6lter rail is best installed on the side toward the
shaker handle, so that any pipes from the hot water
coil do not interfere with the 6lter installation or
removal.
Installing Block Off Jacket
Installing Filter
NOTE: The filter rail is best installed on the
side toward the shaker handle, so that any
pipes from the hot water coil do not interfere
with the filter installation or removal.
- 19 -
Summary of Contents for VF2500
Page 2: ......
Page 3: ... 3 ...
Page 4: ... 4 ...
Page 27: ...Wiring Diagram 27 ...
Page 32: ... 32 ...
Page 35: ...Service and Maintenance Log Date of Service Performed By Description of Service 35 ...
Page 36: ...Service and Maintenance Log Date of Service Performed By Description of Service 36 ...