Subject to change without notice.
LED IT COMPANY LIMITED
Room A, 21/F, Gaylord Commercial building,
114 -118 Lochkart Road, Wanchai, Hong Kong
Contact : [email protected]
4
LARVIK SOLAR User Manual
①
Mounting Solar Panel to bracket with screws tightly
②
Let MC4 cables go through plate of spigot
③
Fix spigot to bracket of solar panel with screws
④
Insert MC4 cables on solar panel into the pole from pole top
⑤
Put spigot on pole top and tight screws of spigot
⑥
Pull out MC4 cable of solar panel from pole support
⑦
Connect MC4 plug of solar panel and light properly
⑧
Insert the MC4 plugs into pole support
⑨
Fix light head on pole support and tight it with screws
⑩
Check every parts are connected and fixed properly
▶
The light turns on at dusk with a pre-programmed setting function and works continuously until dawn.
▶
The ON and OFF functions are controlled automatically by the built in charge
controller with light-sensitive timings. At sunset NTTV ( Night Time Threshold Voltage)
goes less than 7V, the solar panel, the lights will turn ON. In the morning the DTTV (
Day Time Threshold Voltage) from the panel reaches 7V the lights will turn OFF.
▶
The system also comes with a manual switch for manual operation for testing purposes.
INSTALLATION
WORKING MODE & ON and OFF TIME