10 | BA LEANLED II . BA 11/2020
5 | Connection
Suitable connection material, cables and accessories can be found in the accessory
range of LED2WORK. PIN assignment of the M12 connector is as follows:
4 | Assembly / Mounting
Check the LED luminaire before installation to ensure it is complete and shows no
signs of damage. Do not use the luminaire or accessories if they are damaged, as
there is a risk of injury.
The LED luminaire comes fully assembled. The luminaire is attached via the two in-
cluded luminaire holder sets.
Only use the device if it is completely free of faults, and with safety
and awareness in mind. If warnings or symbols are attached to the
luminaire, they must not be removed.
Schematic drawing of M12 plug
4
3
1
2
5
Possible variants of the M12 connector
PIN allocation
PIN 1 = 24V DC
PIN 2 = not used
PIN 3 = GND
PIN 4 = 24V DC
PIN 5 = not used
PIN 3 = 0V DC. 24V DC for supply can be connected to PIN 1 or PIN 4.
It is not necessary to assign both PINs (PIN 1 and PIN 4) at once!
Through-wiring (cascadable):
Through-wiring (cascadable) can be used to link several luminaires electrically to
one another. The total current consumption must not exceed 4 A DC at t
a
max. +40°C.
When mounting the luminaire, make sure that the luminaire is
fastened securely and stably. If the luminaire falls down, its weight
poses a risk of
injury!
vertical
horizontal
~32
360° rotable in 15° steps
~33
~25,5
Set 1
Set 2