leadsun AE6 Series User Manual Download Page 5

Long press the button for (5s) to switch the working modes:

In the OFF mode, if the lighting condition is normal, it will start up automatically; or long

press the button 5s, if the light is ON and then OFF, the product will go into the ON mode.  
In the ON mode, long press the button 5s, the light flash 3 times then off, the product will go 

into the transport (idle) mode; if disconnected from the solar panel, the product will go into 

the OFF mode directly;
In the Transport (Idle) mode, long press the button 5s, if the light flash one time and then off, 

the product will go into the OFF mode; or without any operation after an hour, the product will 

go into OFF mode automatically.

*

*

*

The product factory setting is using the light-operated switch to control the light (light-operated control 

thresholds is 30lx). It lights up automatically at night and lights off at dawn. The light implements 

multiple working modes switching through the intelligent battery control system, which prolong the 

battery working time effectively. It ensures normal working even in the continuous rainy days.

4.

Operation instruction

Product installation

If the installation site is on the northern hemisphere, the solar panel should face to the south 

and if it is on the southern hemisphere, the panel should face to the north. (See Picture 1)  

1

.

 Installation conditions

Make sure the sunlight is not blocked by any constructions or trees during the installation or it will 

affect the charging and discharging efficiency of the solar power system and the operation of the 

street light. (See 

 1.2)

Picture

Picture 1

Equator

Picture 1.2

1

2

8

7

Ø76

±

2

Ø25

600

1

2

3

4

5

2. Split type activation and installation:

Drill holes on the pole.

 Firstly, determine 

and mark the AE6 panel and LED light

position according to the optimum sun 

radiation. Drill a Ф25mm hole   approximately

 600mm down from the top of the pole, where

the light is to be installed. (See Picture 2)  

Attach the bracket to the AE6 unit. 

Thread 

the cables from the hole on the bracket and set 

the proper angle in which the solar panel can 

obtain maximum energy from the sun (each 

scale on the bracket is 6 degree). Fix the bracket 

to the solar panel by fastening a M12 × 85 bolt.  

Thread 2 pieces of 2m waterproof cables through the Ф25mm hole which was made in step one 

and then out from the top of the pole.

Mount the LED light: 

 Mount the LED light on  

Connect the LED light with corresponding cables.

the pole by 4pcs M8 90 bolts. 

×

The maximum torque for those M8 bolts is 14Nm. Do not surpass 

this torque specification. 

Mount the AE6 panel:

Connect the two cables from the top of the pole to the solar panel and install   

 the solar panel ensuring you do not pinch any cables use 6pcs M8 x 16 screws to secure the bracket 

to the pole.

Picture 2

Summary of Contents for AE6 Series

Page 1: ...ddress NO 1 Pingdong 1st Rd Nanping Science Technology Industrial Park Zhuhai China 519060 Phone Fax 86 756 2289712 86 756 8682090 Email sales leadsunglobal com LEADSUN INC Address 1920 S Archibald Av...

Page 2: ...read the below cautions carefully before using the AE6 series solar street light to avoid physical injury and product failure caused by improper use Product protection grade Ip65 High tensile structu...

Page 3: ...the motion sensor 5 LED Illumination 6 USB Type B Port Special port for programming 7 Switch button ON OFF or Turn ON OFF the light 8 USB Type A charging port Charging for the battery please use 14V 1...

Page 4: ...he OFF mode ON mode the system will work normally charging in the daytime and discharging at night 2 Start up Daytime start up when the lighting condition is sufficient 30lx the light will illuminate...

Page 5: ...ace to the north See Picture 1 1 Installation conditions Make sure the sunlight is not blocked by any constructions or trees during the installation or it will affect the charging and discharging effi...

Page 6: ...o 14N m See Picture 5 Connect the solar power system with the extended cables in the light pole and lock the connectors in turns Embed the light pole into the X bracket and use the dedicated tools to...

Page 7: ...ion the gateway system is recommended to be installed in the center of all the street lights 12 11 LORA Terminal antenna installation Gateway antenna intallation Insert SIM Card Insert the 4G SIM card...

Page 8: ...normal work mode Replace the controller or reprogram the controller program 4 Abnormal motion detection Check if the lighting environment temperature is same as that of human body temperature If the...

Reviews: