www.lemaitrefx.com
4.) Remove service port cover to allow
easy access to the
processing coil.
5.) Support the processing tube with
one hand by simply grasping it
firmly near the end of the tube
where the haze exits. With abrazor
tool in hand, guide it through
the service port into the
processing coil with an in and out
motion. The burrs on the
Abrazor will de-scale
the walls , resulting
in a rejuvenated
processing tube.
For a better grip on the
Abrazor tool, a few turns of
electrical tape gives a better
grip of the cleaning tool.
6.) The unit is now ready to reassemble.
Take note of the alignment studs when
assembling the lid. Tighten
knob fasteners.
7.) The maintenance is complete.
Alignment
Studs
Alignment
Studs
Service Port
Tech tip
9