Operating Procedure
Unpack the Bubble Master
2000 and inspect all compo-
nents. Although the packag-
ing was designed for the
rigours of todays parcel deliv-
ery sevices, damage may have
occurred during shipping.
1.) Prior to operation, the
extension sleeve may be
placed over the bubble outlet.
This will allow the bubbles to
be projected higher, before
they begin to disperse outwards.
For lower flying bubbles do not use the extension sleeve.
2.) Place the Bubble Master 2000 on a level sturdy surface, or use the optional adjustable
stand sold separately.
3.) Open a container of Le Maitre BubbleMaster 2000 Bubble Fluid, and pierce the foil top.
Pour the fluid into the bubble outlet. Fill up to 1/2 below the resevoir top. This initially
should take approximately 1 gallon.
4.) Plug the BubbleMaster 2000 into an outlet that is capable of sustaining the current
load listed on the product serial plate.
Setup
3