LBL Lighting TRANSDIR-SFE300 Installation Instructions Download Page 3

POWER FEED CAP

KNURELD CAP

SCREW

6

7

3

2A

SCREW

POWER FEED CAP

KNURLED CAP

CENTER WIRE

POWER FEED HOUSING

MIDDLE
CONTACT

1

2

3

3

Remove the power feed cap from the power feed housing.

Completely back out the screw on the power feed cap.

Loosen

the knurled cap on the power

feed housing and pull the center wire slightly out so that the

middle contact is not exposed in power feed housing.

(Do Not Remove)

NOTE:

The standoffs should be installed to support the

2-Circuit Monorail while connecting 2-Circuit Monorail to
the surface mount transformer. Refer to the instructions
provided with the standoffs.

1

2

3

2B

Place a 2-Circuit Monorail section into the standoffs and

power feed housings.

Screw the power feed cap completely to the power feed

housing.

Make sure that the power feed cap is not cross

threaded.

4

5

POWER FEED CAP

2-CIRCUIT MONORAIL

POWER FEED HOUSING

4

5

Tighten the screw on the power feed cap for proper power

connection.

Tighten the knurled cap for proper power connection.

6

2C

7

Connect the 2-Circuit Monorail to
the Transformer

Summary of Contents for TRANSDIR-SFE300

Page 1: ...tant Safety Information on next column before proceeding with the installation The dimmer must be derated as indicated by the dimmer manufacturer Important Safety Information Do not conceal or extend bus bar conductors through a building wall Do not install this lighting system in a damp or wet location To reduce the risk of fire and burns do not install this lighting system where the uninsulated ...

Page 2: ...sbar Align the transformer holes with the crossbar holes replace and tighten the two 8 32 flat head screws 6 8 32 SCREW 7 7 7 6 1C SAFETY WIRE CROSSBAR BRACKET 4 5 5 Hook the transformer safety wire onto the backplate bracket Connect the backplate to a suitable ground in accordance with local electrical codes For each set of power line wires connect the hot and neutral wires to the black and white...

Page 3: ... should be installed to support the 2 Circuit Monorail while connecting 2 Circuit Monorail to the surface mount transformer Refer to the instructions provided with the standoffs 1 2 3 2B Place a 2 Circuit Monorail section into the standoffs and power feed housings Screw the power feed cap completely to the power feed housing Make sure that the power feed cap is not cross threaded 4 5 POWER FEED CA...

Page 4: ...ghting com 2008 LBL Lighting All rights reserved The LBL Lighting graphic is a registered trademark of LBL Lighting LBL Lighting reserves the right to change specifications for product improvements without notification A Generation Brands Company SAVETHESE INSTRUCTIONS ...

Reviews: