LAZY MAISONS LM-BZS3 Assembly Instructions Manual Download Page 4

Installation Steps

Step 1

3ODFHZRUNVXUIDFH²QLVKHGVLGHGRZQRQDEODQNHW

Step

 

2

 

 

G

 

 

longitudinal

 

beams

 

into

 

   

crossbeams

 

assembly

 

and

 

slide

 

 

to

 

lock

 

into

 

place.

 

Repeat

 

on

 

other

 

side.

Step

 

3

Stretch

 

D

 

crossbeams

 

to

 

where

 

you

 

think

 

it

 

is

 

,then

 

use

 

   

I

(12)

 

wood

 

screws,4.8

mm

through

 

H

 

   

 Rubber 

W

 

saher

 

to

 

 

secure

 
 

 

   

G

 Longitudinal 

 

 

Beams 

and

 

D

 

crossbeams

 

   

 

to

 

worksurface

 

   

as

 

shown.Repeat

 

on

 

other

 

side.

.

 

Use

 

 

 

(8)

 

metal

 

screws

 

,M10

16

 

mm

 

to

 

secure

 

 

connecting

 

beams

 

as

 

shown.

      

   

 

 

 

 

   

   

 

 

 

 

.

 

 

 

 

 

 

   

   

 

   

 

 

 

 

 

 

   

 

 

 

 

 

   

 

 

       

           H
Rubber Washer

 

             G

Longitudinal 

Beam

  

      D

Crossbeam

             G
Longitudinal 

Beam

  

      D

Crossbeam

             E
Connecting Beam

           H
Rubber Washer

 

     

Q

Wire Clip

          I
Wood Screw

         F
Metal Screw

Worksurface

Summary of Contents for LM-BZS3

Page 1: ...Please Read Instructions Before Use ASSEMBLY INSTRUCTIONS LAZY MAISONS HEIGHT ADJUSTABLE TABLE STRAIGHT 3 STAGE T LEG BASE Model Number LM BZS3...

Page 2: ...DQN RX IRU FKRRVLQJ H DSSUHFLDWH WKH WUXVW DQG FRQ GHQFH RX KDYH SODFHG LQ XV DQG DUH FRPPLWWHG WR SURYLGLQJ RX WKH EHVW possible product 1 As with all power operated products please follow instructio...

Page 3: ...pcs Control Wires S 2 pcs Power Cord T 1 pc Wire Clip Q 4 pcs Connecting Beam E 2 pcs Wood Screw M4 8 19 I 14 pcs Metal Screw M10 16 F 8 pcs Longitudinal Beam G 2 pcs Feet B 2 pcs Socket button head b...

Page 4: ...to where you think it is then use I 12 wood screws 4 8 mm through H Rubber Wsaher to secure G Longitudinal Beams and D crossbeams to worksurface as shown Repeat on other side Use 8 metal screws M10 16...

Page 5: ...Step Step 2 M 4 5 N M 4 5 5 6 Pressure Retainer Lever 4 M N A Column Leg D Crossbeam...

Page 6: ...Screw M3 5 16 and O Sticky Card or Q 4 Wire Clips to secure wires below the worksurface as shown Step10 Attach B feet to A column leg with C 8 socket button head bolts M65 Tighten bolts securely Repe...

Page 7: ...UVW WLPH Range 2 at lowest to 45 highest 1 Press and hold simultaneously for more than 3 seconds till legs begin to move down at half speed of normal operation 2 Keep pressing buttons till legs move...

Page 8: ...on or off H SUHVV IXQFWLRQ LV RII H SUHVV IXQFWLRQ LV RQ 4 Touch and hold button S for 2 seconds Preset is on or off 1 Press and hold S Without releasing button S press and hold 2 for 3 seconds 2 RGH...

Page 9: ...y is lower than 0 Per orm reset operation Set display height to 28 Ifproblempersists contact ustomer ervice E08 Motor Short Circuit Motor cable damaged Check the motor cable or damage Ifproblempersist...

Reviews: