mc²36 MKII Installation & Service Guide
Version: 1.0/1
28/56
4. Installation
Installation Procedure
To install an IO connection kit, it is necessary to remove the Overbridge blanking panel and lift up the Central
Panel, in order to access the relevant parts of the console.
DO NOT
attempt to open the frame without first disconnecting the mains supply.
1.
Using a T20 Torx driver, unfasten the two screws at the top of the Overbridge blanking panel. It is best
to stand behind the console frame as shown:
View from above
2.
Gently tilt the unit forwards and remove the RJ45 connector (on the back of the panel):
3.
Carefully remove the Overbridge blanking panel by lifting it out of the frame. Lay it it face-down on a
piece of foam, or similar ESD-proof protective material, away from the console.
Make sure that the two pins on the front of the Overbridge panel do NOT damage the Central Panel.
4.
Follow the first three steps in "
" to open the Central Panel and hold it in place using
the Hood Fastener.
Note that it is not necessary to disconnect or remove the Central Panel.