
7
Caution: before performing this
operation verify that the machine is not
hot so as to avoid burning!
Keep the unit steady by hand on the point “X” to
avoid rotation, disconnect the PTFE hydraulic
tubes by a simply clockwise rotation of the two
quick couplings “A”, each tube contains washer
and joint; unscrew the two heating connectors
“B” with joint “C” by means of the 15 mm
spanner “7”.
Caution: to remount the connector
“B” it is important to apply it a
clamping torque of MAX 2,5 N x mt so
as not to damage them.
They have to be tightened until the
ring nut hits the heating plate and not
more. If possible tighten by hand
without the spanner.
X
A
7
B
C
“LB 1000 BLUE FAMILY” C
OD
. 83346 / R
EL
. 1.00 / S
EPTEMBER
2004
“
Hydraulic section maintenance
4.2
1
0
/
10
Summary of Contents for LB 1000 BLUE FAMILY
Page 1: ......