LMW – Trade Line Owner’s Manual
Contents
Page
Contents
Page
Specifications
1 & 2
Care & Cleaning
4
Rough In Instructions
2
Whirlpool & Air Bath Operation
5
Electrical / Wiring
3
Extra Options / Features
5
Plumbing Instructions
3
Warranty Information
6
Operating Instructions
4
Troubleshooting Guide
6
About this Owner’s Manual
Laurel Mountain Whirlpools has gained popularity by the variety of bathtubs available and the extensive list of
options for each type of tub. This manual covers the installation, operation, and maintenance
needs for the Trade Series of Laurel Mountain whirlpools, air baths, combo baths, and soaker tubs. If you
have any questions or need additional information on your Laurel Mountain Whirlpools bath, you can contact
our customer service department Mon-Fri at 1-800-930-0050 between 6:00 am and 6:00 pm EST.
*INSTALLATION WARNING*
*Your Laurel Mountain Whirlpools bathtub has been water tested prior to shipment. However, due to
transportation and potential on-the-job conditions, you should NOT install this tub until making a final
water test.
*Building material & wiring should be routed away from the pump or other heat producing parts of this tub.
*Please follow these instructions to insure an easy and safe installation process. Any deviations, additions,
or deletions to your Laurel Mountain Whirlpools tub or it’s hardware will void the warranty of this product
if written approval is not obtained from the manufacturer.*
Your Laurel Mountain Whirlpools tub was created to your order specifications. The tub was constructed from
an acrylic shell cast. It was then reinforced with a mixture of chopped fiberglass in a polyester resin applied to
the backside of the shell. The base of your unit was designed to give uniform support to the tub floor and has
been pre-leveled. It meets or exceeds load-bearing and impact resistance requirements of the listed standard
without evidence of crazing or cracking and with minimal deflection when installed in accordance to Laurel
Mountain Whirlpools printed instructions.
PRIOR TO INSTALLATION
Immediately inspect your unit upon arrival. If any damage has occurred, make a notation on the freight
carrier’s proof of delivery. DO NOT remove the bath from its shipping container until you are ready to water-
test and install. When you are prepared to remove the tub from its carton
DO NOT LIFT
the tub out by its
plumbing. We also recommend cutting cardboard from the shipping container to place inside the tub to
protect its floor. Even though your tub has been inspected and water tested prior to shipment, it is very
important that you perform a water test of your own to ensure all of the fittings and connections were not
damaged during transit. Take your tub to an area where you can fill it up, run electrical components, & drain