background image

A/C Service Station

VALUE-100

LAUNCH

®

USER`S MANUAL

Launch Machinery Co., Ltd

Summary of Contents for VALUE-100

Page 1: ...A C Service Station VALUE 100 LAUNCH USER SMANUAL Launch Machinery Co Ltd...

Page 2: ...LAUNCH VALUE 100 A C Service Station User s Manual i 1 1 1 2 3 3 4 5 5 6 6 6 6 7 8 8 9 9 10 11 12 12 13 M 1 13 M 2 14 14 15 16 16 16 17 KG L S R L S KG 17 17 18...

Page 3: ...LAUNCH VALUE 100 A C Service Station User s Manual 1 392 89 1...

Page 4: ...LAUNCH VALUE 100 A C Service Station User s Manual 2 1 1060 500 520 80 70dB A...

Page 5: ...LAUNCH VALUE 100 A C Service Station User s Manual 3 2002 96 EC WEEE WEEE R134a A C OFF A C A C A C A C...

Page 6: ...LAUNCH VALUE 100 A C Service Station User s Manual 4 80 A C A C R134a R134a R134a...

Page 7: ...LAUNCH VALUE 100 A C Service Station User s Manual 5 R134a GWP 1300 A C A C 2 3 2 1 1 2 4 10 2 1 4 1 1 6 1 2 1...

Page 8: ...LAUNCH VALUE 100 A C Service Station User s Manual 6 1 4 5 6 7 a b c d e f g h i j k l m n COM o p q 8 A1 A C A2 A C A3 A4 A6 A7 A8 A9 9 T1 LED T2 LED T3 LED T4 LED T5 LED T6 SEL...

Page 9: ...LAUNCH VALUE 100 A C Service Station User s Manual 7 T1 T4 LED T7 T8 T9 ENTER LED ENTER T10 START LED T11 STOP LED T12 TEMPERATURE F T13 10 C1 5 5 8 5 C2 17 5 C3 80 10kg C4 2kg...

Page 10: ...5 5 6 23 5 7 23 5 5 8 24 5 9 24 5 6 25 6 1 25 5 6 2 26 6 3 26 5 6 4 27 6 5 27 5 6 6 28 6 7 28 5 6 8 29 6 9 29 5 7 1 30 7 2 30 5 7 3 31 7 4 31 5 7 5 32 7 6 32 5 7 7 33 7 8 33 5 8 34 8 1 34 5 8 2 35 8...

Page 11: ...LAUNCH VALUE 100 A C Service Station User s Manual 9 1 A C A C 2 10 3 4 5 SEL LED START LED A C 4 A C 6 OFF 7 A C 1...

Page 12: ...LAUNCH VALUE 100 A C Service Station User s Manual 10 SEL Vacuum START 25 A C SEL Vacuum ENTER ENTER 2 0000 3 A1 A2 2 A C 1 A C e 20 2 3 4...

Page 13: ...LAUNCH VALUE 100 A C Service Station User s Manual 11 A C 1 SEL Charging 2 a ENTER ENTER b ENTER 3 START 8 45 A C...

Page 14: ...LAUNCH VALUE 100 A C Service Station User s Manual 12 4 5 6 A C 3 7 A C 8 1 A C A C A C 3 R134a...

Page 15: ...LAUNCH VALUE 100 A C Service Station User s Manual 13 SEL START 0 50 STOP M1 M2 1 4 11 1 1 2 2 1 2 4 2...

Page 16: ...LAUNCH VALUE 100 A C Service Station User s Manual 14 2 150 300 280 1 2 2 11 3 3 4 10 5 3 6 4 7 2 SERV 12 1 2 3 4 5 1 12 4 12 6 2 12 4 12...

Page 17: ...LAUNCH VALUE 100 A C Service Station User s Manual 15 7 8 9 3 12 5 12 STOP RESET 10 11 2 12 4 12 12 13 1 12 4 12 3 12 5 12 14 15 16 17 10 SERV SEL 18 19 500g 20 21 100...

Page 18: ...LAUNCH VALUE 100 A C Service Station User s Manual 16 200 3 16 18 3 i 7 5 40 10 5 ENTER...

Page 19: ...LAUNCH VALUE 100 A C Service Station User s Manual 17 16 18 SEL ENTER 6 1 0 5 1 2 3 kg lbs lbs kg SEL START ENTER...

Page 20: ...LAUNCH VALUE 100 A C Service Station User s Manual 18...

Page 21: ...PANEL 8 PRELIMINARY OPERATIONS 9 PURGE NON CONDENSABLE GAS 9 RECOVERY RECYCLING PHASE 10 VACUUM PHASE 10 NEW OIL REINTEGRATION 11 CHARGING REINTEGRATION PHASE 11 ROUTINE MAINTENANCE 13 FILLING THE MAC...

Page 22: ...free of charge replacement or repair of defective component parts or parts considered defective by the Manufacturer Reference to the machine serial number must be included in any requests for spare p...

Page 23: ...cking must always be used The manufacturer declines any and all responsibility for damage to vehicles on which recovery recycling and recharging are performed if said damage is the result of unskillfu...

Page 24: ...Wear protective gloves and goggles Do not expose the machine to direct sunlight or rain Use only in well ventilated work areas Before performing any operation check the vehicle use and maintenance ma...

Page 25: ...ental conditions In order that they may be shipped and used they must be compressed into suitable bottles We therefore recommend observing all the general precautions applicable to handling of pressur...

Page 26: ...certain operational and seal tests on the A C system SETUP The machine is supplied fully assembled and tested Referring to Figure 2 mount the hose with the BLUE quick connect coupling on the male thr...

Page 27: ...AND C NTR L SYSTEM Refer to fig 8 A1 High pressure gauge for A C system A2 Low pressure gauge for A C system A3 Printer optional A4 Pressure gauge for bottle refrigerant pressure A6 Emergency alarms p...

Page 28: ...ng this key will start the operation indicated by the lighted LED T11 STOP key Pressing this key will stop the operation indicated by the flashing LED T12 TEMPERATURE key Pressing this key the display...

Page 29: ...le press the temperature bottle key ref T12 fig 9 and read the temperature of the bottle Compare the bottle pressure with the one into the table if the bottle pressure if higher of the pressure read o...

Page 30: ...h During this phase the amount of refrigerant recovered from the system will be displayed in kilograms Upon completion of the recovery phase the machine will stop and automatically discharge the used...

Page 31: ...N 1 Measure the quantity of oil extracted from the A C system and check that the new oil container e contains at least 20 cc more than this quantity 2 Open the high and low pressure taps or in the ca...

Page 32: ...l reappear Please contact your retailer if you wish to install the database 3 Open the high and low pressure taps if previously closed and press the START key ATTENTION if the pressure in the bottle i...

Page 33: ...rnal bottle and the high pressure tap of the MACHINE If the external bottle is not supplied with a suction device turn it upside down to obtain a higher delivery rate Switch the machine on then hold d...

Page 34: ...efrigerant filters are replaced The oil must also be replaced whenever it changes color due to absorption of humidity Before beginning the oil change procedure procure a container of at least 300 cc c...

Page 35: ...Reset 10 Disconnect the machine from the power supply 11 Disconnect the L P quick coupler from the fitting 2 fig 12 of the filter 4 fig 12 12 Replace the old filters with the new ones paying attention...

Page 36: ...ould be performed when the scale values displayed are out of line with known values The operations listed below must be performed with the maximum attention and care Always observe the precautions out...

Page 37: ...e Switch on the MACHINE taking care not to touch any electrical wires Check calibration place a known 0 5 kg or 1 kg reference weight on the bottle and check that the displayed availability value incr...

Page 38: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 39: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 40: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 41: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 42: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 43: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 44: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 45: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 46: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 47: ...LAUNCH VALUE 100 A C Service Station User s Manual...

Page 48: ...________________________________________________________ ___________________________________________________________ ___________________________________________________________ _______________________...

Page 49: ...LAUNCH Conditions of granting of a guarantee on the Equipment LAUNCH ________________________________________ 1 12 2 3 4 IMEI 1 2...

Page 50: ...A C Service Station VALUE 100 LAUNCH Launch Machinery Co Ltd...