5.7 Anchoring
Anchoring
Wrap the oil fittings, cable connections and joints of the
lift to prevent dusts from getting in.
Guided by the hole on the base plate of the lift, drill the
holes into the concrete slab and use concrete anchor
bolts to fix it into the ground. During the
process of
drilling, ensure that no movement occurs to the base
plate form the chalk line (see Fig.11 as installation). Fix
the lift on the ground with 12 M18X160 (M0.7″X6.3″)
anchor bolts.
Turn screws on the base plate to adjust the platform to
the level position, and the difference height between
the two platforms should be less than 3mm. Select the
steel plates with proper thickness as the shims and
insert them under the base plate. Insert the shims into
both sides of the anchor bolts.
Tighten the nuts of the anchor bolts to fix the base
plate.
Cautions: To ensure safety and performance, follow
the installation procedures step by step
.
Wearing the safety goggles.
Use the solid and hard alloy drill bit with Φ19mm
(
0.75″
)
in diameter. Don’t use the drill bit which is
worn more than the tolerance.
The drill bit is vertical to the drilled surface.
Let the drill work by itself; don’t impose any extra
pressure and don’t ream.
The depth of the drilled hole is dependent upon the
length of the anchor bolt; the distance of the bolt head
away from the concrete floor shall be around 30mm
(1.2″).
Blow out the dust in the hole.
Tap the anchor bolt into the hole, and insert the
expansion steel core. Tap the head of the steel core to
make the anchor bolts expanding.
.Screw the bolts tightly using the torque wrench. The
torque of the wrench should be more than 80 N.M
Fig.11
150
φ22
2
130
M18×120