Proline Edition X heating thermostats
28
/
10/9/2018
7
Starting up
7.1
Mains connection
Compare the rating on the nameplate (back of control head) with the mains voltage.
Connect unit only to sockets with a protective earth conductor (PE).
No liability is accepted for incorrect mains connections!
Ensure that pump connectors without external loads are closed off.
Ensure that the unit is filled according to Section 6.3.
Note for electric installation on site:
The devices must be protected with a 16 ampere circuit breaker fitted during installation.
Exception: Devices with 13 ampere UK plugs.
7.2
Switching on
Check whether the main fuse switch
at the back is in the ‘On =
–
’ posi-
tion.
Switch on the mains switch :
The green LED for
‘Mains ON’ is lit,
1 s
an acoustic signal is emitted for about 1 s.
The unit starts its self-test. All display segments and symbols ap-
pear for about 1 second.
The momentary bath temperature is displayed,
the pump starts provided
‘Standby’ or ‘Manual start’ (
Section
7.8.2) has not been programmed,
all values are accepted which were active before switch-off.
Check or set overtemperature cut-off point:
The switching point is shown in the LED display on pressing the key
.
Change overtemperature cut-off (
Section 7.14.1) Overtempera-
ture protection and checking on page 79.
If necessary, top up heat transfer liquid which has been pumped out
by filling the external load.
Self-test
88(((
°C
EXT
Bath temperature
02%32
°C
Overtemperatu. cut-off.
90
°C
Summary of Contents for PROLINE Edition X P 12 C
Page 2: ......
Page 4: ......
Page 112: ...Proline Edition X heating thermostats 112 YACE0099 10 9 2018 Blank page ...
Page 114: ......
Page 115: ......