3 - Setting Up Your Machine
3.6 - Installing the Chip Bag
Page 08
3.6.1
3.6.2
Attach the chip bag as shown by stretching the open end over the
top hook of the chip chute. Continue fitting it around the entire
edge of the chip chute making sure it is snug.
Be sure to empty the chip bag regularly as needed. Failure to
empty the chip bag can result in clogging of the chip chute.
Diagram 3-90
3.7 - Choosing and Installing the Pattern Bar
3.7.1
Your EBM-2.1 comes with five pattern bars included: four (4) com-
mon patterns and one blank pattern as shown in diagram 3-100.
Choose the pattern bar that lines up with your desired pattern.
Diagram 3-100
Blank (Customizable)
3 holes 2-3/4” apart center to center
3 holes 3-1/2” apart center to center
2 holes 2-3/4” apart center to center
3 holes 4-1/4” apart center to center
(standard three ring binder)
3.7.2
Insert a Pattern Bar by loosening the Pattern Bar Stop (EZ-1022)
and inserting the desired pattern into the slot on the Pattern Bar
Guide as shown in diagram 3-110. Insert the angled end into the
slot as far as it will go so that the slot at the end of the Pattern Bar
lines up with the Pattern Bar Stop. When you have the pattern
correctly inserted, tighten down the Pattern Bar Stop through the
slot on the Pattern Bar locking it in place.
Diagram 3-110
3.8 - Electrical Instructions
3.8.1
3.8.2
Your EBM-2.1 comes with an electrical cord containing the plug to
fit into a standard grounded 115V outlet. This machine has a full
load draw of 11 Amps.
Making sure that nothing is interfering with the drill bits, plug the
cord set into a grounded 115V outlet. To turn the machine on,
press the Rocker Switch on the front of the shroud.
Diagram 3-120
Rocker Switch
Power Cord