8. Mainsail
1. Unroll the mainsail near the boom. Locate
the tack slug (figure 38) and slide it into bottom
track area of the mast, and slide down.
(figure 39)
2.Locate the clew slug and slide it into the aft
end of the boom track. (figure 40)
3. Pull the clew aft and attach the outhaul
by inserting the bob through the clew and
securing to the end of the boom. (figure 41)
4. Locate the aft end of the main halyard and
attach it to the head of the mainsail. (figure 42)
5. Make sure the mainsheet and vang will run
free and hoist up the sail, as you feed it into the
sail track. (figure 43)
6. Once the sail is near the masthead, you will
find a stainless ring tied into the line. Pass the
free end the halyard through the ring so a loop
is formed. (figure 44) Use it as a purchase to
hoist the sail fully, when you are ready to sail.
7. Cleat off the halyard, and hang the coil
between halyard and mast. (figure 45)