background image

Megatower Operation Manual 

Page 

5

 of 

5

 

7.) 

At  this  point,  the  outriggers  can  be  retracted. 
Ensure  each  outrigger  locks  into  place  and  the 
jacks have proper ground clearance.

 

8.) 

The  trailer  is  now  ready  for  hookup  to  a  tow 
vehicle.  Once  tied  to  a  tow  vehicle,  raise  all 
leveling  jacks.  Ensure  that  safety  chains,  brake-
away  device,  and  trailer  lights  are  connected. 
Test  trailer  lights  to  ensure  stop/tail/brake  lights 
work  before  operating  vehicle  on 

public 

roadways. 

 

If  you  have  any  questions  about  your  new 
device please call the Manufacture.   

Reviews: