background image

 

 

Megatower Operation Manual 

                                              

Page 

4

 of 

5

 

 

Lowering the mast: 

1.) 

When preparing to lower the mast, open the 
control box and turn the compressor off. 

Once off, turn the air valve located in the gray 
box to drain. 

It may take the mast 10 to 15 

minutes to fully lower. This is normal. 

You will 

audibly hear the air releasing from the mast.

 

Note: Leave the valve in the drain position so it 
will be ready for next use.

 

2.) 

Turn the lights off.

 

 

3.) 

The  mast  should  be  in  the  lower  position  and 
ready  to  lay  horizontally  for  transport.    Remove 
the mast retaining pin located on the right side of 
the  green  job  box.  There  is  a  black  pistol  grip 
handle  on  the  retaining  pin.  Rotate  this  pin 
upwards  and  slide  it  back  towards  the  operator 
until the pin is clear of the mast. 

 

 

4.) 

Once  retaining  pin  is  clear,  locate  the  orange 
pendant  inside  the  gray  box  with  the  air  valve. 
Depress the down button on the pendant until the 
mast is fully lowered horizontally.

 

 

5.) 

Access  generator  controls  and  switch  main 
breaker OFF. Press the red OFF button and turn 
the key OFF. Close access door.

 

 

6.) 

Lock  the  mast  head  into  place  by  going  to  the 
back  of  the  trailer  and  latching  the  pin.  Locking 
the  head  prevents  unnecessary  movement 
during transport. 

 

 

Locked 

Reviews: