EYS INSTALLATION / SEALING COMPOUND 

HAZARD WARNINGS:

 

May cause irritation to eyes and skin. Inhalation dust is considered a nuisance 

dust. Avoid physical contact by wearing appropriate gloves and dust goggles. If powder gets into eyes, 
flood immediately for 15 minutes with water. Wash hand thoroughly with soap and water after 
handling 

Mix 2 parts Sealing Compound to 1 part clean 
water. Mix thoroughly. Do not mix more than 
can be used in 15 minutes. Use cold water as 
warm water accelerates set. 

Vertical Installation: 

Seal fitting is installed with the small access plug in the 
up  position. Both access plugs are removed after 
conductors are  installed.  Damming fiber is installed 
through the lower access port into the  lower portion of 
the fitting body. Care must be taken to insure the  fiber 
fills all voids around each conductor, as well as between 
conductors and the wall of the seal fitting body. Replace 
the lower (large) access plug.  Mix compound according 
to manufacturer instructions and pour through the upper 
(smaller)  access port until compound reaches  the base 
of the access port threads.  Replace remaining plug in 
upper access port. Both plugs are to  be made up with 
five threads engaged and wrench tight. 

Horizontal Installation: 

Seal body is installed with both access plugs in the up 
position.  Both  access plugs are removed after 
conductors are installed.  Damming fiber is installed 
through the large access port into both  ends of the seal 
fitting body to allow sealing compound to flow to  the 
required thickness (Table A). Care must be taken to 
insure the  fiber  fills all voids around each conductor, as 
well as between  conductors and the wall of the seal 
body. 

Replace the small access port plug.  Mix compound 
according to manufacturer instructions and pour through 
the large access port until compound reaches the base 
of  the access port threads.  Replace large plug. Both 
plugs are to be made up with five threads engaged and 
wrench tight. 

Class I Group A & B Installations: 

Vertical Installation: 

Sealing compound is to be mixed at ambient 
temperature above  40°f. / 4°c. and poured into fitting 
with body temperature not below  40°f. / 4°c. Ambient 
temperature (of fitting) must not drop below  40°f. / 4°c. 
for 72 hours. Compound must cure for 72 hours before 
circuits are placed into service. 

Horizontal Installation: 

Sealing  compound is to be mixed at room temperature, 
and  poured into fitting at room temperature. Ambient 
temperature  of fitting must remain at room temperature 
for 72 hours.  Compound must cure for 72 hours before 
circuits are placed into service.

 

Class I Group C & D Installations: 

Sealing compound is to be mixed at ambient 
temperature above  35°f. / 2°c. and poured into  fitting 
with body temperature not below  35°f. / 2°c. Ambient 
temperature (of fitting) must not drop below  35°f. / 2°c. 
for 8 hours. Compound must cure for 8 hours before 
circuits are placed into service. 

Summary of Contents for EPL-TX-8A-EPO-24V-25-EPP

Page 1: ...VE THESE INSTRUCTIONS FOR FUTURE REFERENCE THE EPL TX 8A EPO 24V 25 EPP MUST BE WIRED IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE AND ALL APPLICABLE LOCAL CODES PROPER GROUNDING IS REQUIRED FOR SAFETY WE STRONGLY ENCOURAGE ONLY A LICENSED ELECTRICIAN INSTALL OPERATE AND MAINTAIN THIS PRODUCT IF YOU ARE NOT QUALIFIED OR UNFAMILIAR WITH ANY ASPECT OF THIS INSTRUCTION SHEET CONSULT AN ELECTRICIAN THE...

Page 2: ... CHECKED FOR CUTS BREAKS OR ANY SEVERE ABRASIONS AND IF ANY ARE FOUND THE CORD MUST BE REPLACED BEFORE RESUMING USE OF THE UNIT ELECTRICAL POWER SUPPLY MUST BE OFF BEFORE AND DURING INSTALLATION AND MAINTENANCE INSTALLATION AND MAINTENANCE PROCEDURE MUST BE PERFORMED BY A TRAINED AND COMPETENT ELECTRICIAN IF ANY PARTS OF THE RECEPTACLE OR PLUG APPEAR TO BE MISSING BROKEN OR SHOW SIGNS OR DAMAGE DI...

Page 3: ... state local NEC codes and all protocols for the hazardous area See labels attached to wiring for both Input and Output leads Refer to next page for sealing junctions If removing cover make sure there are no loose or pinched wires when closing cover Replace and tighten all screws removed before MAINTENANCE Electrical and mechanical inspection of all components must be performed on a regularly sche...

Page 4: ...he up position Both access plugs are removed after conductors are installed Damming fiber is installed through the large access port into both ends of the seal fitting body to allow sealing compound to flow to the required thickness Table A Care must be taken to insure the fiber fills all voids around each conductor as well as between conductors and the wall of the seal body Replace the small acce...

Reviews: