12
48
49
50
51
52
53
YF-23
(4)
(
).
The wing plug installation 45~47
45
46
47
(5)
(
).
The bonding of back fuselage 48~49
(6)
(
).
The installation of the permanent seat of EDF cover 50~51
(7)
(
).
The installation of receiver case 52~53
11
36
37
38
39
(2)
(
).
The installation of the wire casing cover and cooling fin. 36~41
40
41
(3)
(
).
The installation of EDF and ESC 42~44
42
43
44