LTR-T Installation Guide
Site Preparation and Unpacking
Before installing the LTR-T, do the following to prepare your site:
• Check space requirements
• Confirm that the LTR-T will have the proper environmental conditions
• Check the installation of other hardware components
• Check the cable connections
• Unpack the unit, making sure all of the parts are enclosed
Each item in this list is explained in detail in this section.
Space Requirements
The table below shows the dimensions of the LTR-T. Allow two inches of space on each
side of the unit for ventilation.
LTR-8T
LTR-16T
Width
8.5”
8.5”
Depth
5.5”
5.5”
Height
2.8”
3.8”
Figure 1: LTR-T Dimensions
Environmental Considerations
The following paragraphs list the power and temperature requirements, altitude
limitations, and relative humidity limitations of the LTR-T. Check these values to
guarantee that the LTR-T can operate in the chosen location.
Power Requirements
Table 1 lists the power requirements for the LTR-T. Note that the unit can operate using
either 110 Vac or 220 Vac outlets. There are no switches or jumpers to change for
international (220 Vac) use. Refer to Appendix A for power supply cord specifications
for use outside the U.S. and Canada.