LP-SW2400S ▪ 24-port 10/100Mbps Fast Ethernet Switch ▪ User Guide ▪ www.lanpro.com
8
Chapter 3: Installation
To ensure a long-term and stable performance of the switch, please pay
attention to the following before the installation.
Precautions
1) Safety Requirements:
3.1
▪
Before cleaning the switch, cut off the power supply. Do not
clean it by the waterish cloth, and never use any other liquid
cleaning method.
▪
Take waterproof measures during storage, transportation and
operation of the equipment.
▪
Use only the power cord provided with the switch.
▪
Make sure the voltage of the power supply meets the
requirement of the input voltage of the switch.
▪
Do not push any objects into the openings of the switch.
▪
Ensure the vent hole is well ventilated and unblocked.
▪
Do not open or remove the cover of the switch.
Figure 4. Switch Rear Panel Sketch
►
Grounding Terminal:
LP-SW2400S
already comes with Lightning
Protection Mechanism. You can also ground the switch through the
PE (Protecting Earth) cable of AC cord or with Ground Cable. For
detail information, please refer to section
3.3 Connect to Ground
.
►
AC Power Socket:
Connect the female connector of the power cord
here, and the male connector to the AC power outlet. Please make
sure the voltage of the power supply meets the requirement of the
input voltage.
Rear Panel
2.2
The rear panel of
LP-SW2400S
features a power socket and a Grounding
Terminal (marked with ).