Langer & Laumann Ingenieurbüro GmbH 48356 Nordwalde Wallgraben 30
+49 (02573) 9 55 99 0
http://www.LuL-Ing.de
+49 (02573) 9 55 99 5 Email: [email protected]
Langer & Laumann
I n g e n i e u r b ü r o G m b H
Geschäftsführer
Dipl.- Ing. Michael Laumann
Dipl.- Ing. Matthias Langer
/ Managing Director
Bankverbindung
Sparkasse Steinfurt
/ Bank Account
BLZ: 40351220 Kto: 7024631
BLZ: 40061238 Kto: 8623333000
Volksbank Greven EG
Handelsregister
Amtsgericht Steinfurt HRB 2943
Ust.-Id.Nr.
DE195553428
/ Comercial Register
/ Vat-No.
4
1 Basic Instructions
1.1 Status of the Installation Instructions
Product installation instructions are enclosed by the manufacturer or supplier in order to provide the cus-
tomer or fitter with the essential knowledge necessary for correct and safe installation. These brief installa-
tion instructions are intended to clarify basic mechanical installation steps and to illustrate the principal dif-
ferences between the door operator versions for telescopic 2 panel, central 2 panel and central 4 panel.
Electrical connection, commissioning and adjustment of the door control unit are expressly not compo-
nents of these instructions.
1.2 Copyright
We reserve all rights pertaining to these technical documents. It is prohibited to reproduce them, make
them available to third parties or to use them in any other unauthorised manner without our prior agree-
ment. Changes require our express prior and written agreement.
1.3 Instructions in the Installation Manual
All instructions in the installation manual absolutely must be adhered to.
1.4 Informal Measures by the Fitter
The fitter installing the system is him/herself responsible for participating in training. He/she must immedi-
ately inform the manufacturer/supplier of missing or damaged delivered parts.
1.5 Requirements of Installation Personnel
Persons responsible for installation and maintenance should be familiar with the generally applicable
safety and work-hygiene regulations. They should be familiar with Langer & Laumann products. Installation
tools are to be properly functional and measuring instruments must be subject to continuous checks.