![Lang 2F11-CLS-L Installation, Operation, Maintenance, & Troubleshooting Download Page 8](http://html1.mh-extra.com/html/lang/2f11-cls-l/2f11-cls-l_installation-operation-maintenance-and-troubleshooting_3539434008.webp)
8
STACKING THE OVENS
Stacking kits include:
4 each of 4’ 150
°
C, 10 AWG copper wire.
4 each of locating pins (3/4”- IOUNC x 2 1/2” long).
1 each of 1 3/8” heyco bushing.
Remove the five plug buttons from the top panel of the lower oven.
Install the insulating bushing in the hole provided on the top panel of the lower
deck for the electrical leads to connect the top deck to the lower deck.
Install four locating pins into the threaded holes provided in the bottom of the upper
deck. Screw in half way.
While aligning the locating pins with the holes, place the upper deck on top of the
lower deck and lower the oven into position.
Wire is supplied for making the electrical connections between the upper and lower
decks for 2F-11 installations. For three-phase connection, three wires are required
between the upper and lower decks. The connection of the three wires from each
deck is then made to lines L1, L2 and L3 at the lower deck per the wiring diagram.
Using the wire provided connect the top oven to the bottom oven through the 1 1/4
knock out in the bottom of the oven.
UNPACKING CONT’D
Summary of Contents for 2F11-CLS-L
Page 16: ...16 WIRING DIAGRAM...