2-2
2P102
OPERATION
For operation the Drawbar link must be free to float.
Remove Klik Pin and Clevis Pin and install it in the
bottom hole under the link. See Figure 2-4.
Figure 2-4: Link Operating Position
For transporting the Drawbar Link needs to be secured.
Remove Klik Pin and Pin. Lower the Jack and raise it until
both straps 2nd hole from the bottom lines-up with slot.
Install pin.
NOTE
When doing this, the Drawbar must be attached to
tractor. It may be necessary to put a block under the Jack
to prevent the Jack from sinking into the ground.
Figure 2-5: Link Transport Position
Disc Gang Adjustment
Disc Gang Adjustment is accomplished by loosening the
inner gang 3/4” - 10 bolt and removing the outer gang
3/4” - 10 bolt. Move the outer bolt to either the front hole
for 15 degrees and to the rear hole for 10 degrees. Be
sure to tighten these bolts before operating the seeder.
See Figure 2-6. The depth can be controlled by the
adjustment of the Three Point Hitch on the tractor. To
increase penetration of the Disc Gangs in hard soil, up to
200 pounds may be added to the optional Rock Box.
Figure 2-6: Disc Gang Angle Adjustment
NOTE
It may take several trips across the ground until the soil
condition meets your planting specifications. Disc Gangs
should be set approximately 1/2” deep in the soil during
seeding.
Summary of Contents for Brillion FPS-6
Page 2: ......
Page 10: ...1 6 2P102 INTRODUCTION AND SAFETY INFORMATION Table provided for general use NOTES...
Page 16: ...2 6 2P102 OPERATION Figure 2 14 Planting Rates Agitator Box...
Page 26: ...3 6 2P102 ASSEMBLY Figure 3 7 Meter Box Front and Rear View...
Page 28: ...3 8 2P102 ASSEMBLY Figure 3 9 Agitator Box Assembly Figure 3 10 Double Seedbox Drive Chain...
Page 30: ...3 10 2P102 ASSEMBLY Table provided for general use NOTES...
Page 40: ...5 4 2P102 GENERAL REFERENCE AND SPECIFICATIONS Page Intentionally Blank...