2-2
9D990-2401
ASSEMBLY
Main Frame Assembly
Assembly of the Main Frame consists of attaching the
Mast and Brace Tube.
1. Place the Frame on blocks at least 36-42 inches high
for the assembly of the machine.
2. Bolt the Mast to the matching Hitch Tube Holes on the
Frame with 5/8" x 4-1/2" Long Capscrews.
Do not
tighten at this time.
3. Fasten the ends of the Brace Tube between the upper
holes in the Mast and between the two Angles on the
rear of the Frame.
4. Place the two Machinery Bushings between the
Brace Tube and Mast Uprights.
5. Secure both ends of the Brace Tube to the Mast and
Frame with 5/8" x 4" Long Capscrews, Lock Washers,
and Nuts.
6. Tighten all hardware to the recommended torques.
See "General Torque Specifications" on page 4-1.
Manual Storage Canister
Install the Manual Canister to the frame with Hose
Clamps.
SMV Sign
Attach the SMV Mount about 4 inches left of center on the
rear Frame Tube with 5/8-11 U-Bolt and Locknuts.
Install SMV Sign to Mount with 5/16-18 x 1
Bolts, Flat Washers and Locknuts.
Figure 2-1: SMV Installation
Figure 2-2: Main Frame Assembly
Rear Frame Tube
Left Angle
REAR
U-Bolt,5/8-11 x
5-5/8 x 4-11/16
SMV Mount
SMV w/Bracket
Bolt,5/16-18 x 1
Flat Washer,5/16
Locknut,5/16-8
Locknut,5/8-11
Brace Tube
Frame
Bushing
1" x 5/8
Nut,5/8-11
Bolt,
5/8-11 x 4-1/2
Manual
Canister
Hose
Clamps
Nut,5/8-11
Nut,5/8-11
Lock
Washer,5/8
Bolt,
5/8-11 x 4-1/2
Mast
Clevis Pin,
1 x 4-1/2
Lock
Washer,5/8
Lock
Washer,5/8
Bolt,
5/8-11 x 4
Summary of Contents for Brillion CPPR2-5
Page 4: ......
Page 10: ...1 4 9D990 2401 SAFETY INFORMATION TABLE OF CONTENTS INDEX Table provided for general use NOTES...
Page 13: ...ASSEMBLY 9D990 2401 2 3 TABLE OF CONTENTS INDEX Table provided for general use NOTES...
Page 26: ...4 4 9D990 2401 MAINTENANCE TABLE OF CONTENTS INDEX Table provided for general use NOTES...
Page 45: ...INDEX 8 3 TABLE OF CONTENTS INDEX Table provided for general use NOTES...