3-5 MAIN FRAME ROCKSHAFT
3-5.1
Lay rockshaft
(See Figure 3-5)
on frame
with wheel spindle holes in rockshaft lift arm
toward front of frame.
3-5.2
Lubricate inside of rockshaft bearings and
upper reinforcement bar surfaces.
Notes:
10’-10” frame requires four bearings: Two inner
and two outer.
9’-6” frame only requires two inner bearings.
3-5.3
Both Frames: Install rockshaft bearings
with a reinforcement bar under frame at each
bearing location.
10’-10” Frame: Also install one reinforcement
bar between rockshaft and frame at each
outer bearing location.
3-5.4
Attach all bearings and bars to frame with
3/4” x 8-1/2” cap screws, lock washers, nuts.
Note: Position grease fittings toward rear.
3-5
Figure 3-5 Rockshaft Installation
Summary of Contents for 1230 Series
Page 8: ......
Page 12: ...NOTES 2 4...
Page 31: ...3 19 Figure 3 42 10 10 Main Frame Assembly Layout Walking Beam Axle 12 Shank Spacing...
Page 32: ...3 20 Figure 3 43 10 10 Main Frame Assembly Layout Walking Beam Axle 15 Shank Spacing...
Page 33: ...3 21 Figure 3 44 10 10 Main Frame Assembly Layout 19 Folding Model...
Page 34: ...3 22 Figure 3 45 10 10 Main Frame Assembly Layout 21 and 23 Folding Models...
Page 36: ...NOTES 3 24...
Page 60: ...NOTES 4 24...
Page 62: ...NOTES 5 2...
Page 63: ......