Section 1: Assembly & Set-up
RCF2784 & RCR2684 S/N Rotary Cutters 326-364M
16
7/26/19
Driveline Installation For RCR2684 & RCF2784 (RCF2784 Shown)
Figure 1-7
Driveline Installation
DANGER
!
To avoid serious injury or death:
Refer to Figure 1-7 on page 16:
1.
Remove rubber protective sleeve (#8) from gearbox
input shaft and discard.
2.
Unsnap one end of access doors (#9) and rotate
doors open.
3.
Slide slip-clutch end of driveline (#11) onto gearbox
input shaft until hole in driveline yoke aligns with
groove in gearbox shaft. Insert M12 x 1.25 x 65mm
GR8 bolt (#2) and secure with flat washer (#4) and
hex nylock nut (#3). Tighten nylock nut to the correct
torque.
4.
Push/pull on driveline yoke to be sure it is securely
fastened to the gearbox shaft.
5.
Collapse driveline (#11) by pushing on tractor end of
driveline towards the cutter gearbox shaft.
6.
Rotate driveline hanger (#13) down and support
driveline (#11) on the hanger.
7.
Rotate access doors (#9) closed and snap in place.
IMPORTANT:
The drivelines must be lubricated
before putting them into service. Refer to
3-Point Tractor Hook-up
Refer to Figure 1-7:
DANGER
!
To avoid serious injury or death:
•
A crushing hazard exists while hooking-up and unhooking
•
All guards and shields must be installed and in good
working condition while operating the implement.
•
Do not engage power take-off while hooking-up or
A tractor with 3-Point Category lI or lII hitch is required.
The lower 3-Point arms must be stabilized to prevent
side-to-side movement. Most tractors have sway blocks
or adjustable chains for this purpose.
1.
Slowly back tractor to the Rotary Cutter while using
tractor’s 3-Point hydraulic control lever to align lower
3-Point arm hitch holes with clevis hitch pin holes.
The tractor’s lower 3-point arms must
NOTE:
Land Pride’s Quick Hitch can be attached to
the tractor to provide quick and easy 3-point hook-
up and detachment. See your nearest Land Pride
dealer to purchase a Quick-Hitch.