6
POST MIX ACCESSORIES:
High Pressure CO
2
Regulator
Low Pressure CO
2
Regulator
Manifold
CO
2
Supply
Chain for CO
2
Tank
Beverage Tubing
Oetiker Clamp Fittings
Water Booster
(Lancer PN: MC-163172)
Water Regulator (recommended)
CONSIDER THE FOLLOWING
BEFORE INSTALLATION:
Location of Water Supply Lines
Location of Electrical Outlet
Location of Heating and Air
Conditioning Ducts
Do you have enough space to
install the chiller?
Is countertop level?
Can the countertop support the
weight of the chiller?
Is chiller located away from
direct sunlight or overhead
lighting?
Not in area where water jet could
be used.
TOOLS REQUIRED:
Oetiker Pliers
Tubing Cutters
Wrench
Slotted Screwdriver
Phillips Screwdriver
Drill
BAG-IN-BOX (BIB) SYSTEM:
BIB Rack
BIB Syrup Boxes
BIB Regulator Set
BIB Connectors
General System Overview - Remote Syrup Pumps
PRE-INSTALLATION CHECKLIST
75
110
75
Syrup Line
CO
2
Line
Plain Water Line
Carb Water Line
Electrical
Python Line
A. Water Source
B. Remote Carbonator
C. BIB Syrup Containers
D. Syrup Pump
E. Chiller
F. Electrical Outlet
G. CO
2
Source
H. Dispenser
B
A
C
C
C
C
C
C
E
F
G
D
D
D
D
D
D
H